Opportunity

Accessible Homes Design Assurance Platform

Accessible-housing requirements are often checked late, drawing by drawing and across separate planning, technical-design and building-control workflows.

AccessibilityPropTechComplianceProperty & Built EnvironmentB2B SaaSUnited KingdomUnderserved score 85/100Published Aug 10, 2026

Decision snapshot

Primary user
- Disabled and older residents whose housing choices are restricted by inaccessible stock. - Wheelchair users and families needing suitably sized, located and fitted homes.
Why now
- An explicit percentage requirement creates a calculable compliance workload on every eligible scheme. - The identified 3,500-home wheelchair need shows a material gap between demand and suitable stock.
Initial wedge
A project workspace that imports a unit schedule and PDF or BIM drawings, calculates the M4(2)/M4(3) obligation, tests distribution and records evidence at planning, technical design, pre-handover and occupation.
Key uncertainty
Evidence 25/25 + severity 18/20 + buyer urgency 16/20 + market gap 11/15 + timing 8/10 + delivery feasibility 7/10 = 85/100.

The problem

Accessible-housing requirements are often checked late, drawing by drawing and across separate planning, technical-design and building-control workflows. Unit schedules change, M4(3) homes can become clustered in less desirable positions, exceptions are weakly evidenced and a compliant planning schedule may not survive value engineering or construction change.

Liverpool's draft Policy H12 would require almost all new homes to meet M4(2), with 10% M4(3)(2)(a) on schemes of ten or more dwellings and 10% of affordable-rented homes fully fitted to M4(3)(2)(b). The requirement applies across tenure and expects a mix of dwelling sizes, aspects and floor levels. This is a data and assurance problem as much as a design problem.

Who is underserved

- Disabled and older residents whose housing choices are restricted by inaccessible stock. - Wheelchair users and families needing suitably sized, located and fitted homes. - Architects, technical coordinators and housebuilders managing changing unit schedules. - Registered providers nominating residents and accepting completed homes. - Planning and building-control officers checking evidence under time pressure.

Evidence

Local evidence: - Draft Policy H12 requires M4(2) for new homes other than defined exceptions, 10% M4(3)(2)(a) on schemes of 10+ homes, and 10% fully wheelchair-accessible M4(3)(2)(b) within affordable rent. - The policy expects M4(3) homes across tenures and distributed by aspect, floor, view, unit size and type rather than concentrated as residual units. - Liverpool's housing-needs assessment identifies a need for 3,500 wheelchair-user homes and supports a 10% M4(3) requirement.

Wider evidence: - National guidance requires planning authorities to identify older and disabled people's housing needs and consider accessible, adaptable and specialist housing.

Commercial implication: - Per-unit assurance is measurable, repeatable and valuable to developers, providers and authorities at several project gateways.

Demand

- An explicit percentage requirement creates a calculable compliance workload on every eligible scheme. - The identified 3,500-home wheelchair need shows a material gap between demand and suitable stock. - Planning conditions and building-control evidence create multiple paid assurance points. - Registered providers have a direct operational interest in correct fit-out and nomination-ready handover.

Competition

Current alternatives include manual design reviews, access consultants, Part M checklists, BIM rule-checking and building-control inspection. These services are trusted but often episodic and document-led.

Differentiation is a unit schedule that remains linked to requirements and evidence through design changes, plus portfolio analytics showing accessible-home delivery by tenure, type and location. Professional reviewers can use the platform rather than be displaced by it.

The opportunity

A project workspace that imports a unit schedule and PDF or BIM drawings, calculates the M4(2)/M4(3) obligation, tests distribution and records evidence at planning, technical design, pre-handover and occupation. Changes to unit mix automatically expose compliance drift.

A resident-nomination handover module can securely record which M4(3)(2)(b) homes are fully fitted and ready, without exposing health information to unnecessary project users.

Commercial model

Pricing classification

Proxy based — medium confidence.

Indicative pricing

Illustrative commercial model: - Project setup and rules configuration: £3,000-£8,000. - Automated assurance: £150-£400 per dwelling, with volume tiers. - Independent access-professional review: £1,000-£4,000 per block or gateway. - Developer or registered-provider enterprise licence: £30,000-£80,000 per year. - LPA portfolio and reporting licence: £25,000-£60,000 per year.

Evidence basis: Access Assure (£90 per user per year) is the closest verified adjacent anchor used here. Its buyer, duration and scope are not assumed to be identical; implementation is separated where the opportunity requires integration, assurance or managed delivery.

Commercial test

Ask one housing provider, venue group, council or responsible design/operations owner to fund a paid test of Accessible Homes Design Assurance Platform lasting 8–12 weeks, using an opening price of £3,000-£8,000 and covering 10 live homes, venues or service journeys plus review by disabled users or an independent access specialist. Paid scope: A project workspace that imports a unit schedule and PDF or BIM drawings, calculates the M4(2)/M4(3) obligation, tests distribution and records evidence at planning, technical design, pre-handover and occupation. Charge by site, property, venue portfolio or organisation and compare the fee with specialist access-audit time, late design/operational rework and repeated user information requests. Measure verified access-information completeness, issues found before delivery, remediation lead time, user task success and false assurance. Continue only if at least 90% of required access evidence is complete, a material issue is caught earlier and disabled-user testing confirms the output is usable. Stop or reprice if a critical barrier is missed, users cannot rely on the information or specialist review/rework savings do not cover the fee.

Monetisation models and pricing estimates are research-informed and indicative only. Where direct pricing evidence is unavailable, estimates may use comparable products, procurement data, adjacent market benchmarks and stated assumptions. They are not financial advice, forecasts or guarantees of commercial viability. Independent market, legal and financial validation is recommended before acting.

Score rationale

Underserved score 85/100

Evidence 25/25 + severity 18/20 + buyer urgency 16/20 + market gap 11/15 + timing 8/10 + delivery feasibility 7/10 = 85/100. Confidence is 90/100 because policy thresholds and the 3,500-home need are explicit and the workflow is technically bounded; willingness to pay and professional-liability structure still require validation.

The score is evidence-informed editorial judgement based on manually reviewed sources. It is not a forecast or guarantee. How we score →

Evidence sources8

Some evidence sources may require an account or sign-in to view the original content.